S-100WG7 (2022)
7th S-100 Working Group (S-100WG) Meeting / 2nd GI Registry Workshop
5 - 13 Dec 2022 / Monaco
Last update: 8Dec 2022
Post Meeting Documents: [List of Decisions&Actions, Final version] - [Group Photo1 / 2 / 3] - [Bulletin Report]
Doc Number |
Date |
Title |
|
|
Meeting Announcement |
|
|
Logistics Information |
|
|
S-100WG7 meeting Online Registration, Deadline is below
|
GI Registry Workshop Online Registration, Deadline: 4 Nov 2022 |
||
S-100WG7 Meeting ( 5 -9 Dec 2022) |
||
1. Opening and Administrative Arrangements |
||
S-100WG7-1.1 |
|
List of Documents (this page) |
S-100WG7-1.2 |
6 Dec | |
S-100WG7-1.3 |
|
S-100WG and PT Terms of Reference |
|
|
|
2. Approval of Agenda |
||
S-100WG7-02.1 |
3Dec | |
|
|
|
3. Matters Arising and HSSC Working Group Reports |
||
S-100WG7-03.1 |
|
|
S-100WG7-03.2 |
23Nov |
Review of previous S-100WG Actions (.doc) |
S-100WG7-03.3 |
|
HSSC14 Report |
S-100WG7-03.4 |
|
HSSC14 Actions |
S-100WG7-03.5 |
Council6 : S-100 Roadmap Timeline |
|
S-100WG7-03.6 |
1Dec 9Nov |
S-101 Project Team / Presentation - S-101 PS (Ed 1.1.0 Clean / Redline, Consolidated comments(.doc)) - S-101 DCEG (Final draft Ed 1.1.0 / Change log / Remodelled items) |
S-100WG7-03.7 | 1Dec | S-102 Project Team / Presentation |
S-100WG7-03.8 | S-121 Project Team | |
S-100WG7-03.9 |
5Dec |
S-129 Project Team / Presentation |
S-100WG7-03.10 |
28Nov |
|
S-100WG7-03.11 |
28Nov |
S1OOP Project Team / Presentaion(Rev.1) - Webviewer Manual(.pdf) |
S-100WG7-03.12 |
|
|
S-100WG7-03.13 | ||
4.S-100 Proposals - Post Edition 5.0.0 |
||
S-100WG7-04.1 |
2Nov | Technical corrections to Edition 5.0 Parts 10b and 17 |
S-100WG7-04.2 | 2Nov | Corrections to S-100 Part 8, 10a, 10c and 17 / Presentation |
S-100WG7-04.3 | 2Nov | Management of external resources extended descriptions |
S-100WG7-04.4 | 2Nov | S-100_SupportFileRevisionStatus clarification / Presentation |
S-100WG7-04.5 | 7Nov | Add portrayal CRS for LineSymbol |
S-100WG7-04.6 | 7Nov | Add visibleParts to LineSymbolPlacement |
S-100WG7-04.7 | 7Nov | Alert catalog correction |
S-100WG7-04.8 | 7Nov | Add HostInformationGetAssociatedInformationIDs |
S-100WG7-04.9 | 7Nov | Spatial relations involving MultiPoint geometries |
S-100WG7-04.10 | 7Nov | Update to align with FC model |
S-100WG7-04.11 | 8Nov | Table Indexes of Part 10c |
S-100WG7-04.12 | 8Nov | Table Reference in Part 10c |
S-100WG7-04.13 | 8Nov | S-100_VerticalAndSoundingDatum to a new section in Part 10c |
S-100WG7-04.14 | 22Nov | Editorial Changes in Part 10a |
S-100WG7-04.15 | 22Nov | Renumbering of Clauses in Part 10a |
S-100WG7-04.16 | 22Nov | ISO/IEC8211 Summary in Part 10a |
S-100WG7-04.17 |
22Nov 05Apr23 |
|
S-100WG7-04.18 | 22Nov | Scale Propoerties at Feature to Geometry Relations |
S-100WG7-04.19 | 22Nov | Schema use in Presentation Library XML and XSD files |
S-100WG7-04.20 | 22Nov | Primary Association between Feature Types |
S-100WG7-04.20A | 28Nov | Comments on Primary Association between Feature Types |
S-100WG7-04.21 | 1Dec | Correct Part 9a default line join style |
5. S-98 Interoperability Specification |
||
S-100WG7-05.1 |
30Nov | S-98 Interoperability Specification_Unresolved comments (.zip) |
S-100WG7-05.2 | 7Nov | Standardization of the portrayal of shared edges |
6. S-100 General Topics |
||
S-100WG7-06.1 |
6Dec |
IMO Updates |
S-100WG7-06.2 |
23Nov | Update S-100 Infra-system to Edition 5.0.0 of S-100 / Presentation |
S-100WG7-06.3 | 18Nov | Producer Code Register for S-100 / Draft guideline (.doc) |
S-100WG7-06.4 | Guideline Document for the GI registry proposal process | |
S-100WG7-06.5 | 23Nov | Improvement of the Interface between the Concept Register and Hydro Dictionary database (S-32) |
S-100WG7-06.6 | 29Nov | Metadata related to products where data extent may exceed area of responsibility / Presentation |
S-100WG7-06.7 | 30Nov | S-100 Part 15 - Identifiers and Procedures / Presentation |
S-100WG7-06.7a | 3Dec | Comments on Part 15 - Idenfifiers and Procedures |
S-100WG7-06.8 | 30Nov | S-1XX Dataset Naming Convention / Presentation |
S-100WG7-06.9 | 3Dec | Summary of progress against Dual Fuel Concept for S-100 ECDIS items |
7. S-164 |
||
S-100WG7-07.1 |
18Nov |
S-164 Sub-Group (S-164 Phase 1 / Test Dataset Details(.xlsx)) / Presentation |
S-100WG7-07.2 |
|
|
|
|
|
8. S-100 Validation |
||
S-100WG7-08.1 |
29Nov | Validation Test (as of June 2022), Validation Checks (2022_.xls / 2021_.xls) |
S-100WG7-08.2 | 7Dec | Validation Presentation / (.ppt) |
|
||
9. S-100 Test Bed Reports |
||
S-100WG7-09.1 |
2Nov |
|
S-100WG7-09.2 |
2Nov |
|
|
|
|
10. HSSC Working Groups and External Liaison Reports |
||
S-100WG7-10.1 |
|
ENCWG |
S-100WG7-10.2 |
|
NCWG |
S-100WG7-10.3 |
|
NIPWG |
S-100WG7-10.4 |
|
DQWG |
S-100WG7-10.5 |
|
ISO |
S-100WG7-10.6 |
|
OGC |
S-100WG7-10.7 | IEC | |
S-100WG7-10.8 | 8Dec | IEHG Presentation |
S-100WG7-10.9 | JCOMM/WMO | |
S-100WG7-10.10 | Report from WWNWS-SC/S-124PT | |
S-100WG7-10.11 | IALA | |
11. Any Other Business |
||
S-100WG7-11.1 |
|
|
12. Review of Meeting Actions | ||
13. Date and Venue of Next Meeting | ||
14. Close of Meeting | ||
Link to GI Registry Workshop2 Page |
11th meeting of S-102 Project Team (8 - 9 Dec 2022) |
||
S-102PT11-1 | 8Dec | Agenda |
S-102PT11-2 |
8Dec |
Draft 2.2.0 Change Guide |
S-102PT11-3 | 8Dec | Draft Redline Ed. 2.2.0 of S-102(6Dec2022) (.doc) |
S-102PT11-4 | 9Dec | Table 10.7 Corrected (.doc) |
S-102PT11-5 | 9Dec | 10.2.1 Feature codes |
S-102PT11-6 | 9Dec | Draft Redline Ed.2.2.0 of S-102(8Dec2022) (.doc) |
6th meeting of S-129 Project Team (8 Dec 2022) | ||
S-129PT6 meeting page link here |
Share this page: